sub contents

korea nuclear technology co.,ltd.

Operation & Maintenance

Fuel Inspection System Underwater LED Lighting Fixture Seismic Qualified I&C Cabinet Hydrogen Distributor Scaffold System Neutron Source Assembly

Application

Scaffold System(SS) is used to install the metal working platforms in Nuclear Plants Construction.

Features

  • Model No. : KNT-SCA
  • Scaffolding Tower : Max. 32m high
  • Modular Scaffolding : Max. 76m high
  • Residual Load Capacity : 400 kg/module
Scaffolding Tower
Scaffolding at Site